Tale Of Trading
Advertisement
  • World News
  • Business
  • Politics
  • Investing
No Result
View All Result
  • World News
  • Business
  • Politics
  • Investing
No Result
View All Result
Tale Of Trading
No Result
View All Result
Home Investing

Daydream-2 Operations Update

August 17, 2024
in Investing
0
Daydream-2 Operations Update
0
SHARES
2
VIEWS
Share on FacebookShare on Twitter

Elixir Energy Limited (“Elixir” or the “Company”) is pleased to provide an update on the Daydream-2 program in its 100%-owned Grandis Project in Queensland’s Taroom Trough.

HIGHLIGHTS

Lorelle Sandstone flows gas at stabilized flow rates of 2.1 and 2.5 MMSCFPDFlow rate of Lorelle zone alone approaching the modelled economic hurdleFive stage stimulation program now underway

The flow test of the Lorelle Sandstone post stimulation was completed yesterday. On-site operations have now moved to the stimulation of the 5 upper zones.

The Lorelle Sandstone was flow tested from 4,200 meters to 4,217 metres directly through the 4 1/2” casing without a completion. The well was tested at multiple rates and multiple choke sizes. The well flowed gas at a maximum rate of 3.5 Million Standard Cubic Feet Per Day (MMSCFPD) and on multiple occasions stabilized rates were observed between 2.1 and 2.5 MMSCPFD throughout the flow period (see Appendix 1 for full disclosures required under Listing Rule 5.30).

As the test progressed, it has become clear that stimulation fluid in the wellbore was accumulating and suppressing the stabilized rate. Running a completion string in the hole in any future production test would resolve this issue and significantly improve the gas production rate. Engineering calculations suggest that with the appropriate completion string in the hole, the well would flow at a stable rate of 3.0 MMSCFPD. Towards the end of the testing, minor amounts of condensate were recovered.

The unstimulated rate achieved in April 2024 from the same zone was 1.3 MMSCFPD. The results of the test show that the stimulation was successful and caused a material increase in gas flow.

Click here for the full ASX Release

This post appeared first on investingnews.com

Previous Post

Trident Royalties PLC Announces Holding in Company

Next Post

Former Afghan prosecutors hunted down, killed by Taliban 3 years after US withdrawal

Next Post
Former Afghan prosecutors hunted down, killed by Taliban 3 years after US withdrawal

Former Afghan prosecutors hunted down, killed by Taliban 3 years after US withdrawal

    Stay updated with the latest news, exclusive offers, and special promotions. Sign up now and be the first to know! As a member, you'll receive curated content, insider tips, and invitations to exclusive events. Don't miss out on being part of something special.


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Recent News

    The history of how Trump and Bolton’s relationship fell to tatters

    The history of how Trump and Bolton’s relationship fell to tatters

    August 24, 2025
    FBI raid of John Bolton’s home reportedly linked to classified documents probe

    FBI raid of John Bolton’s home reportedly linked to classified documents probe

    August 24, 2025
    GOP senators push for Kamala Harris’ testimony as House Oversight eyes subpoena

    GOP senators push for Kamala Harris’ testimony as House Oversight eyes subpoena

    August 24, 2025
    Israel set to launch Gaza City offensive: High stakes, high costs ahead

    Israel set to launch Gaza City offensive: High stakes, high costs ahead

    August 24, 2025
    • About us
    • Contact us
    • Privacy Policy
    • Terms & Conditions

    Copyright © 2024 taleoftrading.com | All Rights Reserved

    No Result
    View All Result
    • World News
    • Business
    • Politics
    • Investing

    Copyright © 2024 taleoftrading.com | All Rights Reserved